E-Solutions

Burjuman Center Refurbishment ,Dubai, UAE

BurJuman Centre B1 Refurbishment work is to upgrade the existing Mall facilities to cope up with the new Mall concept in Dubai. It has been planned to achieve this motto by adding new facilities to the existing building within the minimum budget in shortest time period. The refurbishment work scope of works consists of but not limited to the following:

  • Demolition of selected existing structures/ internal finishes, fixtures & fittings/ skylights and entrance glazing, to suit proposed new layout.
  • Strengthening of the existing structure to take the load requirements of the new facility.
  • Construction of a new structure on the roof to house 14 nos. cinemas and Family Entertainment Centre.
  • Relocation of MEP equipments of the roof top and other service rooms to the new assigned locations.
  • Renovation of complete MEP distribution systems.
  • Internal remodeling to enable the construction of a new hypermarket.
  • New finishes to all existing public areas.
  • External façade upgrades to match the Burjuman – B2 block building.

Implementation of new safety & security systems integrating with existing Burjuman – B2 block systems.

Back